Case Study 5 Chelsea Health Club & Spa London SW6

The site The Health Club and Spa is located behind Chelsea Football Club’s Stamford Bridge ground in a complex including two hotels and other facilities. Holland Systems installed this system in 2016, and maintained it until the 2024 closure of the club for redevelopment. Holland Systems was merged into Ace Defence in June 2023. The […]